Difference between revisions of "Q1"

From Open Rail Data Wiki
Jump to navigation Jump to search
(New page for Q1)
 
(Added ECS, Stepping tables & Block schematic post implementation works)
 
Line 6: Line 6:
  
  
* [[]]
+
* [[File:Q1 ECS.gz]]
 
This file contains the ECS
 
This file contains the ECS
  
  
* [[]]
+
* [[File:Q1 Block Schematic.gz]]
 
This file contains the block schematic
 
This file contains the block schematic
  
  
* [[]]
+
* [[File:Q1 Stepping Tables.gz]]
 
This file contains the stepping tables
 
This file contains the stepping tables
  

Latest revision as of 17:54, 1 April 2017

Q1 - Romford ROC (Stratford Workstation)

NOTE:: Over the weekend of 5th & 6th November 2016 the Stratford IECC (Liverpool Street IECC “B”) will be replatformed to a scalable IECC located at Romford ROC. There are no material changes to stepping data behaviours. The new system at Romford will be identified in SMART and downstream information systems as “Q1” and the existing Stratford IECC (SMART identity “SI”) will be abolished.


This file contains the ECS


This file contains the block schematic


This file contains the stepping tables



Network Rail Open Data Feeds
Data Feeds About the Feeds Account States Durable Subscriptions Example Code ( PHP / C# / Java / Ruby / Node.js) • Advanced UsesFAQ Release Notes
RTPPM RTPPM Feed
Train Movements Train Movements Feed Train Activation Train Cancellation Train Movement Train Reinstatement Change of Origin Change of Identity Change of Location TSPEED Field Planned Cancellations Cancellation Codes
TD TD Feed C-Class Messages S-Class Messages Train Describers TD Berths
VSTP VSTP Feed
TSR TSR Feed Route Codes
SCHEDULE SCHEDULE Feed Schedule and Location Records Association Records CIF Codes How Scheduling Works Allowances
Reference Data Reference Data Feed TOC Codes CIF Codes Delay Attribution Codes Identifying Locations (STANOX, TIPLOC, NLC and 3-Alpha Codes) STANOX Geographical Areas Train Planning data