Difference between revisions of "Q2"

From Open Rail Data Wiki
Jump to navigation Jump to search
(Added ECS, Block Schematic & Stepping Tables)
 
m (Update Q2 page)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
===Q2 - Romford ROC (Shenfield Workstation)===
+
The following data is available for the Romford ROC (Shenfield Workstation) system:
 
 
 
 
NOTE::  Under this scheme, the Shenfield IECC (Liverpool Street IECC “C”) will be re-platformed to a scalable IECC located at Romford ROC. There are no material changes to stepping data behaviours. The new system at Romford will be identified in SMART and downstream information systems as “Q2” and the existing Shenfield IECC (SMART identity “[[SE]]”) will be abolished.
 
 
 
 
 
 
 
* [[File:Q2 ECS.gz]]
 
This file contains the ECS
 
 
 
 
 
* [[File:Q2 Block Schematic.tar.gz]]
 
This file contains the block schematic
 
 
 
 
 
* [[File:Q2 Stepping Tables.gz]]
 
This file contains the stepping tables
 
 
 
 
 
  
 +
{| class="wikitable"
 +
!Asset
 +
!Link
 +
|-
 +
|External Communications Subsystem specification
 +
|[[File:Q2 ECS.gz]]
 +
|-
 +
|TD Block Schematic
 +
|[[File:Q2 Block Schematic.tar.gz]]
 +
|-
 +
|TD Stepping Tables
 +
|[[File:Q2 Stepping Tables.gz]]
 +
|}
  
 
{{Navtable-DataFeeds}}
 
{{Navtable-DataFeeds}}
  
 
[[Category:Train Describer Data]]
 
[[Category:Train Describer Data]]

Latest revision as of 14:59, 12 December 2018